Uxcell DC 9V Battery Clip I-Type Connector 5.7" Long Lead Wire 10 Pack
- 9V battery clip connector, T-type plastic shell, 2 wire connector.
- 10cm stripped and tinned leads, 1 red and 1 black for easy identification, and soldering terminal connector for 9-volt battery or for DIY projects.
- Simple operation, compact size, replacements for replacing your old or damaged ones.
- Note: Battery is not included here!
- Insulated leads
- Fits 9-Volt – I type batteries
- Red and black leads
- Leads measure 5.7" long each
- Buckle Size: 30 x 16 x 6mm / 1.18" x 0.63" x 0.24" (L*W*H)
- 10 Pack of Battery Clip






Reviews
There are no reviews yet.