Product Description :
In October of 2004, Horizon Hobby rocked the RC world by unveiling one of the most revolutionary products to ever hit the market: Spektrum 2.
4GHz Digital Spectrum Modulation Technology.
Similar technology in the computer and telephone industries has eliminated interference, increased signal resolution, and provided a stronger link between the base units and the transmitting units.
Since then, racers and now pilots have embraced Spektrum technology, and the future is even more promising.
Important information
Safety Information
WARNING: Read the ENTIRE instruction manual to become familiar with the features of the product before operating. Failure to operate the product correctly can result in damage to the product, personal property and cause serious injury. This is a sophisticated hobby product. It must be operated with caution and common sense and requires some basic mechanical ability. Failure to operate this Product in a safe and responsible manner could result in injury or damage to the product or other property. This product is not intended for use by children without direct adult supervision. Do not use with incompatible components or alter this product in any way outside of the instructions provided by Horizon Hobby, LLC. The product manual contains instructions for safety, operation and maintenance. It is essential to read and follow all the instructions and warnings in the manual, prior to assembly, setup or use, in order to operate correctly and avoid damage or serious injury.
Product Details :
| Detail | Value |
|---|---|
| Product Dimensions | 4 x 3.4 x 0.42 inches |
| Item Weight | 0.32 ounces |
| Item model number | SPMSH2040TL |
| Country of Origin | China |
| Date First Available | June 29, 2022 |



Reviews
There are no reviews yet.